This 3D custom animation introduces the hopper clean out process, introducing the vacuum hose, access hatch, accumulated fly ash, and refractory seal. Specific conditions of this facility are shown and then demonstrates how a worker became trapped inside an upper boiler vestibule leading to devasting injuries.